still more woodworking

I have now completed basically all of the fabrication portion of this construction project.  All the wood pieces are built and clear-coated.  The chassis box and the lower back panel are labeled and coated with epoxy.  Note that I have not drilled the holes for all the pots and switches yet; I have found that it works fine to defer this until after the epoxy stage: the holes drill cleanly, and the panel labels double as the drill plan.

Now, "all" that remains is to build the electronics to populate the box!

 







Comments

Popular posts from this blog

schematics and layout diagrams

quick-start guide for the version-1 prototype